Showing posts with label Columbus XCr Stainless Steel. Show all posts
Showing posts with label Columbus XCr Stainless Steel. Show all posts

Wednesday, July 15, 2009

Rapha Build: US221

Another stainless steel SSR Rapha frame set, this time a complete build.
Sterling silver Rapha headbadge.
Designed, cut, welded, brazed, polished, painted, built up, photographed and presented to you directly from Indy Fab.
I.F. crown seat collar, carbon fiber seat tube insert and painted in graphics.

US221...... If you click on the picture below (to make it bigger) you will notice a green sparkle in the white paint. This is a green pearl added to the white, very subtle but nice in the sun.
Selle Italia Flite Team saddle.
Blacked-out Chris King headset with 3t stem, seatpost and bars.
DT Swiss ceramic bearing hubs laced up to some deep dish EDGE carbon fiber tubular rims.
EDGE 2.0 carbon fiber fork and Sram Red gruppo.

Monday, June 8, 2009

The Stainless Report: XCr - 06

Completed! Built up with 2005 Campagnolo Record CT, EDGE 2.0 fork with custom paint, Campagnolo Neutron wheels, Ritchey WCS stem and bar, Chris King headset, Selle Italia SLR saddle and King Cage stainless H2O cages.
Some detail shots:
Ground dropouts.

H2O reinforcements:
Bottom bracket area:
I've been putting some miles on her and will prepare a report on the XCr in the weeks to come.

The Stainless Report: XCr - 05

Now that she is welded and aligned, it's time for the parts. First the brake bridge gets mitered.
After mitering it is deburred and double checked before cleaning.
Same for the chainstay bridge. Holes are also drilled in that frame within the bridges to allow the argon to flow into them while welding
After welding the bridges in and completing the welding portion of the frame build, we move onto the finishing area and visit our head finisher Finn. He has lots of experience brazing the bits onto stainless frames and Bella is more than safe in his hands.
Finishing includes much more than just brazing, when Finn is done working on the frame it is, for all intents and purposes, a ridable frame (minus the surface treatment). After reaming, slotting and drilling the seat tube, a stainless steel reinforcement washer is brazed onto the the area at the bottom of the slot.

Then the water bottle bosses are brazed into place. Finn added the fancy pointy reinforcement gussets around them for added bling and sturdiness.



Then all of the cable stops are brazed on.
The headtube is then reamed, completing the finishing process.

I left out a bunch of stuff, such as: tapping and facing the bottom bracket, drilling and tapping for the headbadge bolts, doing the wheelcheck, and a whole host of other things. These parts of the building process will, no doubt, be covered at some point.

So now it is time to polish, build and ride..

The next entry in The Stainless Report will be focusing on the completed bicycle, she already has 100 miles on her....